Mashpi Lodge

DESCRIPTION

Design and assembly of HVAC.

 

Nanegalito

2011

EQUIPMENT

 

INSTALLED EXPERTISE

Interesting fact:

  • The air conditioning design of this high-end hotel presented an important challenge, since the control of the very high humidity of the cloud forest environment had to be contemplated.
  • We placed an innovative design with VRF equipment that resulted in a high level of comfort for guests, avoiding the deterioration of the rooms and hotel equipment.

Gallery

Our social networks:


Visit our bussines partner in Panama: CLIMAIN

Contact Us

Manta Sail Plaza Wyndham Hotel

DESCRIPTION

Design and assembly of HVAC, Fire protection systems, Plumping systems and steam generation systems, boiler room and heat recovery system.

 

Manta

2015

PROMOTER BUILDER

Arq. Christian Wiese – Inviardu Real Estate

EQUIPMENT

 

INSTALLED EXPERTISE

Interesting fact:

  • The Engineering here focused on the use of sustainable energy and energy saving.
  • The mechanical design of the building was completely adapted to the concept of the architect, whose vision was to present a completely innovative product for the country’s hotel sector.
  • We used air conditioning systems with heat recovery for each floor, focusing only in the generation of hot water without affecting the use of valuable space in the hotel.
  • This system was the first to be implemented on a large-scale building. For us, it was a change for envisioning what can be done to contribute to the energy saving of the planet, thus benefiting the promoter of the building and delivering comfort to its guests.

Gallery

Our social networks:


Visit our bussines partner in Panama: CLIMAIN

Contact Us