HCAM Carlos Andrade MarĂn Hospital
DESCRIPTION
Design and Assembly of HVAC systems in 10 new high-tech operating rooms.
Quito | |
2009 |
EQUIPMENT
INSTALLED EXPERTISE
Interesting fact:
- We designed and assembled a VRF system for Operating Rooms, eliminating pipelines and high outdoor occupancy.
- A centralized ventilation system with variable speed was implemented to operate according to the demand and pressure of each Operating Room, reducing costs significantly.
Gallery
Interhospital Guayaquil
DESCRIPTION
Re-design and assembly of air conditioning systems, air handlers, boiler room for hot water and heat recovery systems.
Guayaquil | |
2016 |
PROMOTER BUILDER
Etinar
EQUIPMENT
INSTALLED EXPERTISE
Interesting fact:
- With the engineering implemented in this Hospital we eliminated the use of traditional heating systems that use fossil fuels, such as diesel boilers.
- We opted for energy savings through the recovery of heat from the air conditioning systems in order to heat the sanitary water used throughout the hospital.
Gallery
Zofragua Guasmo del Sur Hospital
DESCRIPTION
Installation of the HVAC systems, fire protection, heat recovery systems, steam boilers and boiler room.
Guayaquil | |
2016 |
PROMOTER BUILDER
China CAMC Engineering Co., Ltd.
EQUIPMENT
INSTALLED EXPERTISE
Interesting fact:
- This Hospital is characterized for implementing a mechanical engineering system that allows great energy savings.
- It is the first hospital of the Ministry of Health in which an air conditioning solution with variable volume refrigerant equipment was implemented in 100% of its facilities.
- For the proper management of the air in the critical areas of the hospital, air handler “kits” were used for the first time, which permitted adapting to Variable Volume Refrigerant systems.
Gallery
IESS San Francisco Hospital
DESCRIPTION
Design of the HVAC system of stages I and II, Supply of equipment and materials of the HVAC system. Supply, installation and start-up of the Plumping system, Fire Protection and Steam systems of stage I.
Quito | |
2012 |
PROMOTER BUILDER
Interplan and Makiber Builder
EQUIPMENT
INSTALLED EXPERTISE
Interesting fact:
This Hospital was assembled in aproximately 9 months due to the high hospital demand that Quito requires. This challenge was accomplished by CLIMEC entirely, since we complied with the schedules established by the client to deliver the entire hospital on its due date.